“Twelve months of electricity bills, your tariff, site details, operating hours, roof or land space, generator details, critical loads and your preferred funding model.”
Why the information matters
A feasibility assessment is only as good as the information behind it. Without accurate site and energy data, any system size, savings estimate or payback period is a rough guess.
Here's what to gather for a commercial, agricultural or food-processing site.
1. Electricity bills
Ideally, 12 months of bills. They show:
Fixed charges.
Monthly usage.
Demand charges.
Tariff structure.
Seasonal patterns.
Time-of-Use exposure.
Baseline energy cost.
Twelve months matter because most agri and food operations are seasonal. A citrus packhouse, macadamia processor, irrigation farm, cold store or abattoir rarely uses energy evenly through the year. If interval (half-hourly) meter data is available, include it too.
2. Site details
Site layout.
Roof areas.
Available land.
Site address or GPS pin.
Photos or drawings, if available.
Carport or other mounting options.
Property ownership or lease status.
Roof condition, orientation, shading, structural capacity and available space all shape the design.
3. Operating profile
Operating hours.
Seasonal demand.
Planned expansion.
Production schedules.
Irrigation schedules.
Main energy-consuming equipment.
Refrigeration or cold-storage requirements.
Solar generates during daylight, but some demand falls early in the morning, in the evening or overnight. The operating profile shows how much of your load solar can actually cover.
4. Backup and generator information
If you have a generator, include:
Generator size.
Diesel usage.
Maintenance costs.
Which loads are backed up.
How often the generator runs.
Whether it should be integrated into a future hybrid system.
Battery storage can be valuable, but the need depends on your actual backup requirement.
5. Commercial preference
Indicate whether you're open to:
Capex ownership.
Hybrid structure.
Financed ownership.
Phased implementation.
Power purchase agreement (PPA).
The best technical solution can change depending on how the project is funded and what the business wants to achieve.
6. Grid and compliance
Grid-tied systems must meet connection and registration requirements. The process starts with an application to your supplier (Eskom or the municipality), which may lead to metering changes or network upgrades.
Practical checklist
Before a feasibility review, prepare:
Generator details.
Operating hours.
Backup requirements.
Main loads and equipment.
Site address or GPS pin.
Site photos or drawings.
Future expansion plans.
Preferred commercial model.
12 months of electricity bills.
Contact person and decision-maker details.
Have your bills and site details ready? Send them to HolmStone and let's see what solar can really do for your operation.